North Wapiti Pipeline System

Keyera is developing the North Wapiti Pipeline System (NWPS) which is a 37 kilometer pipeline system connecting to the Keyera Wapiti gas plant at 03-19-067-07-W6.  This pipeline system will include a 12-inch sour gas pipeline, 8-inch sour liquids pipeline and 8-inch fuel gas line in a single right-of-way, which will be constructed simultaneously. 

Wapiti_Pipeline

 

PROJECT AREA

North Wapiti Pipeline System Map (PDF)

The North Wapiti Pipeline System will be located in the County of Grande Prairie (North of the Wapiti River) and the MD of Greenview (South of the Wapiti River). The project would be located 8 kilometers south of Wembley and 13.5 kilometers west of Grovedale.

 

PROJECT FACILITIES

  1. Keyera Pipestone Compressor (08-15-070-08-W6)
  2. Proposed radio tower – located at the proposed Pipestone Compressor

 

PIPELINE SECTIONS

(single right-of-way)

  1. 12-inch sour gas line: Pipestone tie-in (15-14-70-08-W6) to Keyera Wapiti gas plant (03-19-067-07-W6)
  2. 8-inch sour liquids line: Pipestone tie-in (15-14-70-08-W6) to Keyera Wapiti gas plant (03-19-067-07-W6) 
  3. 8-inch fuel gas line: Pipestone tie-in (15-14-70-08-W6) to Keyera Wapiti gas plant (03-19-067-07-W6)
  4. Valve sites: (15-70-08-W6) and (10-70-08-W6)